Operating requirements and maintenance of wire drawing machines

Drawing machine before processing, the operator should carefully read the drawings and related technical information, and to understand and grasp. Processing, to correctly select and confirm the drawing direction, drawing surface, etc., in accordance with the rules of operation. Also maintain the appearance of the workpiece to prevent it from being scratched, to avoid the formation of waste.

 Drawing machine processed products, should be gently put, and layered maintenance, to avoid damage to the product. Equipment outside and around should adhere to clean and tidy and sanitation; air supply lines, joints, and sanding belts, etc. to check, touch is outstanding, whether the need for adjustment; air filter in the water discharge, the bearing seat, etc. for smoothing.

 In addition to the daily maintenance content, but also check the wire drawing machine conveyor belt, belt tension is appropriate, whether the need for adjustment; wire drawing machine operation is correct, as well as safety, to ensure that the wire drawing machine can always maintain a good working condition.

 Wire drawing machine for general plastic wire drawing machine gold wire higher requirements, the entire system is more complex, control equipment, the requirements of the reconciliation between the various motors. The system selected four servo motor control, fully meet the real-time interaction between the data between each group of each axis of real-time data exchange between the servo.

 Demand for fast motor-axis interaction between the system view, in order to ensure that in accordance with the algorithm of the track side of the side line of the local area, the line of wire required to be able to quickly account for, we also fully utilize the servo internal firmware function by the drive itself accounting, self-driven motor line line, greatly eliminating the traditional plastic wire drawing machine control system of the line’s orientation to the accounting of the line and then due to the moment of deferral is sent to the Drive to ensure that the line to minimize the delay through the manipulator.